MCQ
541.
CPM -
Production Planning
synthesising in concepts
is built of activities oriented program-mess
is based on one time extimate is used for repetitive works
all of the above
542.
PERT analysis is based on-
optimistic time
most likely time
pessimistic time
all of the above
543.
Plant layout are-type.
four
five
six
none
544.
Product layout is used for-
job production
batch production
mass production
any one of the above
545.
The most important function of inventory control is-
stock control system
technical responsibility for the state of materials
to run the stores effectively
all the above
546.
PERT/CPM, techniques can be used for following applications—
once through project
maintenance jobs
research and development
all non-technical jobs
all of the above
547.
Gantt chart is mostly used for-
routing
follow up
scheduling
inspection and quality control
548.
The types of layout for machine shop are—
2
3
5
4
549.
Direct expenses include-
factory expenses
selling expenses
administrative expenses
none of there
550.
In break even analysis, total cost consists of-
fixed cost + sales revenue
variable cost + sales revenue
fixed cost + variable cost
fixed cost+ variable cost + profit
551.
A CPM family includes-
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
CPS (Critical Path Scheduling)
all of the above
552.
শিডিউলিং তথ্যের প্রধানতম কাজ কী?
ফরমায়েশ
কার্য অনুসূচি প্রণয়নে সহায়তা
বিক্রয়ের পূর্বাভাস
সবগুলো
553.
Key to chart is provided in-
Man machine chart
The load chart
The progress chart
Gantt chart
554.
The works study is done by means of-
planning chart
stop watch
process chart
any one of above
555.
Master schedule is prepared for-
Single product continuous production
Multi product batch production
Assembly product continuous production
Single product batch production
556.
যদি লাভ দেওয়া থাকে তখন BEP কোনটি –
BEP=b-a+profit/FC
BEP=FC+profit/b-a
BEP=FC-a/b
সব কয়টি
557.
Break even analysis consists of-
fixed expenses
variable cost
fixed and variable cost
operation cost
558.
The correct sequence of operations in production planning and control is—
Routing-Scheduling-Dispatching-Follow up
Scheduling-Routing-Dispatching-Follow up
Dispatching-Routing-Scheduling-Follow up
Routing-Scheduling-Follow up Dispatching
559.
Indirect expenses include-
factory expenses
selling expenses
administrutive process
all the above
560.
In a production process which should be taken first?
control
operation & maintenance
planning
none