MCQ
501.
Direct expenses include-
factory expenses
selling expenses
administrative expenses
none of there
502.
The works study is done by means of-
planning chart
stop watch
process chart
any one of above
503.
Centralized and decentralized are the types of-
routing
scheduling
dispatching
follow up
504.
Master schedule is prepared for-
Single product continuous production
Multi product batch production
Assembly product continuous production
Single product batch production
505.
Both Rowan plan and 50-50 Halsey plan will provide the same earning-- the standard time.
one fourth
one-half
equd to
twice
506.
PERT analysis is based on-
optimistic time
most likely time
pessimistic time
all of the above
507.
Indirect expenses include-
factory expenses
selling expenses
administrutive process
all the above
508.
Work study is concerned with- -
improving present methad und finding standard time
motivation of workers
improving production capability
improving production planning and control
509.
Key to chart is provided in-
Man machine chart
The load chart
The progress chart
Gantt chart
510.
Critical path method- -
helps in ascertaining time schedules
makes better and detailed planning possible provides a standard method for
communicating project plans schedules performance
all of the above
511.
Break even analysis consists of-
fixed expenses
variable cost
fixed and variable cost
operation cost
512.
Gantt chart is mostly used for-
routing
follow up
scheduling
inspection and quality control
513.
The production scheduling is simpler and high volume of output and achieved in the case of--
product layout
process layout
fixed position layout
a combination of luse and process layout
514.
Product layout is used for-
job production
batch production
mass production
any one of the above
515.
In a production process which should be taken first?
control
operation & maintenance
planning
none
516.
The most important function of inventory control is-
stock control system
technical responsibility for the state of materials
to run the stores effectively
all the above
517.
Bin card is used in--
admimatrative wing
workshop
foundry shop
stores
518.
The types of layout for machine shop are—
2
3
5
4
519.
Work study is most useful--
where production activities are involved
in judging the riding of machines
in improving industrial relations
in judging the output of a man and improving it
520.
The critical path of a network represents--
the minimum time required for completion of project
the maximum time required for completion of project
maximum cost required for completion of project
minimum cost required for completion of project