সিভিল ডিপার্টমেন্টের "" সার্ভেয়িং "" সাবজেক্টের সকল MCQ এখানে পাবেন। Civil Engineering এর চাকরি প্রস্তুতির জন্য ডিপার্টমেন্ট ও নন-ডিপার্টমেন্টের সকল MCQ এর প্রশ্ন উত্তর ব্যাখ্যাসহ এখানে পাবেন। সহকারী/উপ-সহকারী প্রকৌশলী চাকরি প্রস্তুতির জন্য আমাদের App: Engineering Classroom গুগল প্লে-স্টোর থেকে ডাউনলোড করে নিন। Surveying all MCQ, Civil Engineering MCQ
341. There are two stations A and B. Which of the following statements is correct? [BB-20]
342. A closed contour line with one or more higher ones inside to represent -[BB-20]
A closed contour line with one or more higher ones inside to represent a hill. Similarly closed contour line with one or more lower ones inside it indicates a depression without an outlet.
343. During survey of an engineering project, the laws of accidental errors follow which of the following principle? [BB-20]
Laws of accidental errors follow the probability law, Which is having a definite law for accidental error accurence. It defines the errors and helps in expressing them in the form of equations.
It consists of determining the difference of elevation between consecutive points by comparing each point after the first that immediately preceding it. The difference between their staff reading indicates a rise fall according to the staff reading at the point.
349. Which one is not surveying instrument? [MOD-20]
Chains and Tapes. Taking accurate measurements is one of the most important tasks a land surveyour must complete.... Compasses and Clinometers, Transits and Theodolites, Levels, Safety Gear, Prisms and Reflectors, Magnetic Locators, Poles, Tripods and Mounts.
350. For a traverse containing 10 sides, what would be the correction applied for the first side, if it consists a closing error of + 1.92? [BB-20]
The correction for sides in a traverse is given as correction = e/N, where N is the number of sides and e is the closing error. On substitution, we get, correction = 1.92/10 = 0.192.
351. The contour intervals depends on the-. [MOD-20]
The choice of suitable contour interval in a map depends upon four principal considerations, These are- (i) Nature of the Terrian, (ii) Scale of the Map, (iii) Accuracy, (iv) Time of Cost.
355. The constant vertical distance between two adjacent contours is called[BPSC-22)
The constant vertical distance between two adjacent contour is called contour interval and horizontal distance between two contours is known contour gradient.
359. The method of surveying in which field work and plotting work are done simultaneously is called- [MOD-20]
Plane table surveying is a graphical method of survey in which the field observations and plotting are done simultaneously. It is simple and cheaper than Theodolite survey but it is mostly suitable for small scale survey.